Started the left elevator today. I had already smoothed the stiffeners when I prepared the right elevator so I was able to get a lot done tonight. I clecoed and match drilled all the stiffeners and trim plate to skin, and then I took everything apart (not much at this stage) and deburred all the drilled holes.
Match drilling the stiffeners
Continue to clecoe and drill
Deburring all the holes - just one or two turns needed