Brief Description: 1: Centre Section Floor Nutplates
This morning I realised a mistake from a month-or-so ago. I went and riveted nutplates to the centre section floor ribs. These nutplates are for screwing down the tunnel cover (over the elevator control rod), however at the time I didn't realise that aft section floor pieces also need to be in place when these nutplates are installed.
Bugger.
Today I drilled them all out.
Centre section floor nutplates all needed to come out
Pretty hot out today! Outside temp is as measured against the tin wall