KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  11-18-2017
Number of Hours:  4.00
Manual Reference:  9225501-LOG-05.008
Brief Description:  2: Tail Tie-Down

Another step I came across today that hasn't already been done is fabrication and installation of the tail tie-down bracket.

This was very awkward to install into the quick-built fuselage and would be much easier to do during assembly of the bulkhead, as per the instructions. For some reason Vans seem to leave out obscure steps for the quick-builder to do, which actually end up taking more time due to difficulty of installation. Anyway, I got it done.
' style=

My newly fabricated tail tie-down bracket

My newly fabricated tail tie-down bracket

' style=

Match drilling the tie-down to the rear-most bulkhead. Try doing this without a right-angle drill

Match drilling the tie-down to the rear-most bulkhead. Try doing this without a right-angle drill

' style=

Tie-down riveted into the tail section. Four bolts get added later for further strength.

Tie-down riveted into the tail section. Four bolts get added later for further strength.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.