Date:  1-29-2017
Number of Hours:  2.50
Manual Reference:  9225501-LOG-03.034
Brief Description:  2: Spray Painting

After alodining was complete I then set up a spray table at the front of the shed, mixed up about a quarter litre of epoxy two-pack primer, and set about spraying all the spar and rib pieces.

I've read some nasty things about two-pack paints so I made sure I was "kitted up" with disposable overalls, gloves, goggles and respirator. Forgot to get a picture, but I'm sure I looked sexy :-).

While I waited for the first side of all the pieces to dry enough to flip over and do the other side, I also dimpled the vertical stabiliser skin on the c-frame dimpler. I then rubbed the inside surface down with isopropyl alcohol and spray painted with acid etch primer.

I finished off the day by priming the back-side of all the rib and spar pieces. Everything is now ready for riveting together, however I'm in Adelaide all next week, so it's going to have to wait until I get back. Oh well, at least that'll give ample time for the paint to properly harden.
' style=

Did all my spray painting in the shade at the front of the shed.

Did all my spray painting in the shade at the front of the shed.

' style=

All parts primed, and ready for riveting.

All parts primed, and ready for riveting.