KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  11-25-2017
Number of Hours:  3.00
Manual Reference:  9225501-LOG-05.014
Brief Description:  3: Fuselage Bits

In between alodining and priming I also got a few other tasks done today.

I installed both fuel breather line bulkhead fittings in the forward cockpit area. This had me confused for quite a while as the Vans Quickbuilders rivetted the pilot hole where the bulkhead fitting needed to go. I studied the drawings for a long time before deciding that I needed to drill out a perfectly good rivet so I could enlarge the hole to accept the fitting. Done now.

I also completed the two half built brackets that attach the seat back support rib to the longerons, one each side. Just needed to cut away a portion of the bracket as per instructions for a sliding canopy, and then match drill holes to the seat back rib and longerons. All done.

Finally, I got a start on the elevator bellcrank. Smoothed all parts, match drilled, deburred and alodined. Will prime and assemble tomorrow.
' style=

The right side fuel breather line bulkhead fitting. There was a rivet here.

The right side fuel breather line bulkhead fitting. There was a rivet here.

' style=

The seat back rib bracket cleco'd in place

The seat back rib bracket cleco'd in place

' style=

Preparing the elevator bellcrank

Preparing the elevator bellcrank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.