Brief Description: Continued work on port side aft baffle
Fabricated a doubler to reinforce the entire rear baffle where the cooler will attach. The baffle and the doubler plate were cut for the cooler and match drilled. The heavy spacer for the outboard flange was fabricated and everything was clecoed together for test fitting.