Today was a long day fabricating the spinner bulkhead and backing plate with doubler. The 13" backing plate had to be cut to match the doubler. This was primarily a fly cutter operation (very carefully accomplished on a drill press).
Once the main plate was cut it was match drilled, deburred, prepared and primed. Finally, the backing plate was riveted to the doubler.