KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
' style=
Date:  9-18-2014
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Began wheel pant prep and installation

Today was devoted to trimming and fitting the two piece wheel pant assemblies. The fiberglass moldings are good but they still require quite a bit of trimming and sanding to get a neat fit between the halves. Once the fit is good it's time to match drill and install the seven nutplates in each fairing. I then countersunk the nose pieces and secured with the flush head screws called out in the plans. I may revisit the counter sinking at a later date when the pants are prepped for painting.

The assemblies should be ready to install on the main gear.
' style=

Two Pieces Fitted

Two Pieces Fitted

' style=

Screws and Nutplates

Screws and Nutplates

' style=

Close Up

Close Up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.