KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  10-19-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Gear work

More Gear work on the Rt leg. They are drilled and the bolts are installed. they are now ready to be tourqued. There are 2 more bolts to be installed (The harndest ones).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.