KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-17-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Gear Work

only a few of the holes are in the brackes for allignment. the rest have to be drilled after getting the gear straight.

Installing and removing the bolts are challanging when its just me doing the work.

I rigged a way to get the bolts tights from the top and bottom in order to tourque them correctly.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.