KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  4-24-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Fuse Paint Prep

Wrapped up the wings in plastic and moved them to the other side of the shop. pulled in the Fuse and stripped all the parts and tucked all the wiring under the floor. Masked off all the stuff I don't want painted and preppep all the surfaces. A trip to the store for some sheet plastic and a Paint gun.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.