KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  10-11-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  V Stab

VS frame was DE burred, Assembled with Clecos, Skin installed and Final drilled all attachment points. The lower spar needs to be flush riveted so the main spar was dimpled and the reinforcement was machine recessed to accept the dimple.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.