KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  10-5-2014
Number of Hours:  7.00
Manual Reference:  
Brief Description:  HS Priming

Today I took All my Clecos out and made sure all of the parts were smooth before priming. After everything was Disassembled, I dimpled all of the ribs. Labled and primed the left side first while I prepped the Right side.

While the right side was drying, I started the dimple process on the Skins with the C Frame and the Hand squeezers.
' style=

Started with Some Zinc Chromate

Started with Some Zinc Chromate

' style=

RIght Side

RIght Side

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.