KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  7-15-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Controls for Carb

Continued to work the controls to change the direction and setup for the throttle cable,
Made 4 changes to the bracket to make the crank and linkage line up correctly. it is now ready to make out of stee using the wood versions as a template.

Still need to work the crank dimentions to ensure full throw.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.