KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  10-18-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Gear Work

Started with the right leg.

got the holes alligned and brackets straight. then i was able to get the rest of the holes drilled.

Once they were drilled, I was able to get the majority of the bolts in and snug until I get the rest drilled.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.