KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  2-11-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Rt Fuel Tank removal and Inspection

Removed the Rt Tank since it was temp installed, Inpspected all seals and hardware. 2 of the nutpaltes needed to be installed still so that was taken care of. fuel indicatioin was hooked up as well.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.