KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  6-11-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Paint Prep

All of the wires I ran through the spar were pulled back through and re-labled with tape so I can prep the pilots floor for paint. I also removed the control and fuel system to open it all up for access. Then I started to wipe it down with alcohol to remove the factory coating.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.