KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  5-30-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Interior Panels

One by one each panel was scuffed and prepped for paint. I also double checked each panel for fitment. I found a few places that need some work.

The Pilot seat ramp was the last piece that needed work so once the other panels were installed (Temp) I was able to setup the seat ramp and the passenger rudder pedal brackets. The next step here is to install the nutplates on the ramp and scuff it.

Once that is done, I am going to mark each place that will be receiving paint so I can plan the procedures.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.