KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  11-26-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuse Pickup

Had the Fuse delivered to the local freight hub in town. Got it loaded onto the trailer and strapped down for the trip back to the shop. Getting it off of the trailer took some backyard engineering. I was too concentrated on not damaging it to take pictures while I was unloading it.

Unloading was basically dropping the ramps on the back and setting up the Come-Along securely to the shop wall and dragging it down the ramp onto some vehicle tire dollies so I can push it around the shop.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.