|
|
Pauls Web Site
|
Date: 4-9-2016
|
Number of Hours: 3.50
|
Manual Reference:
|
Brief Description: Initial visit
|
|
Brought Lindsay up to speed on the general state of the project. Reveiwed the existing documentation and supplied the project website. Lindsay checked the work that I had done on the Ailerons and the general state. We spent a lot of time discussing what to do next and it was decided that I should break the project into major assemblies and work through ALL the defects and modifications for that assembly. The major assemblies are as follows: Canard, Fuel, Electrics, Avionics, Instrumentation, Forward fuselage, Aft fuselage, Controls.
Canard; Brake system; Master cylinders, Slave cylinders/actuators brake lines. Main wheels; Balancinig, fitting, Pitiot head; Fitting and plumbing, Elevators: Repair. Fitting. Trim. Rigging.
Access panels; Repairs.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |