Powered By Kitlog Pro v2.0
The Hurricane
H-2 Prototype
All
8-31-2012
< Previous Log Entry
Next Log Entry >
Date:
8-31-2012
Number of Hours:
2.50
Manual Reference:
Brief Description:
New instrument panel
The first instrument panel was very limited with regard to useable space and it was questionable whether the EFIS would fit. That problem has been fixed with the new nose construction.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
H-2 Prototype Home
Category
# Logs
# Hours
All
30
273
Control System
3
13
Elevons
1
12
Empennage
2
21
Fan
1
14
Fuel Tanks
1
4
Fuselage
11
120
Left Main Gear
2
20
Left Wing
2
23
Nose Gear
2
14
Right Wing
3
28
Rudder
1
2
Vertical Stab
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.