Brief Description: Drilling SIde Skins and Longeron
Today I worked on drilling the longerons to the side skins. I put several clamps holding the root edge of the longeron flush with the side skins on and then drilled all the holes up to the F-904. Then I clamped the firewall in place in preparation for drilling the longerons in front of the F-904.