KitLog pro

Powered By Kitlog Pro v2.0

The Rose's RV-9A
' style=
Date:  12-4-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left Tank and Left leading edge

This evening I looked over the tank in preparation for sealing the baffle in this coming weekend. Then put the leading edge in the cradle and marked out the hole for the landing light. I made the initial cuts with a 3" abrasive wheel in my die grinder leaving approximately 1/16 of material on the straight cuts and alot on the corners.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.