KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  5-6-2022
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Centre Fuselage Connector

Today I was able to trim the various looms that terminate at the centre fuselage connector to length then install the sockets & assemble the connector. I've checked with a meter, the continuity of the circuits & am satisfied the pinouts, as pictured below, are correct. I've decided not to have the beacon light synced with the strobe lights as I forgot to include the required wire in the loom, bugger. I don't believe it is worth the time, effort & materials to rework the loom simply to have the red light flash at the same time as the white ones!!!
' style=

Connector completed

Connector completed

' style=

Light, GMU & Garmin looms in place

Light, GMU & Garmin looms in place

' style=

Pinout

Pinout

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.