KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  1-13-2022
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Flight Control Stand For The Hangar

I've been running out of room to store things at home as they return from paint. Today at the hangar, I manufactured a stand that will hold all the flight controls & both vertical & horizontal stabilisers. The uprights are 25.4mm diameter dowel covered with foam tubing & the horizontal rails have 5mm thick felt pads to protect the paint and allow it to breath. It's large enough for the parts of two Slings, PGC will hopefully soon be in a position to utilise it too.
' style=

Drilling holes for the dowels

Drilling holes for the dowels

' style=

Assembling the frame

Assembling the frame

' style=

One flap & one aileron test fit OK

One flap & one aileron test fit OK

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.