Today I riveted the remaining positions on the rudder pedal channel along with the floor level of the forward interior skins. Installed the hydraulic hoses that go to the park brake valve from the left set of master cylinders & tightened the lock nuts on the rod ends, installed the remaining split pins on the pedal pivot hardware then made a set of bungees to hold some tension on the rudder cables. These may stretch over time but at the pace I'm building, I'll know how well they hold up before the first flight. On to the firewall installation, some priming of lap joints done, most components clecoed to the firewall, centre console parts clecoed in to confirm it's all still in alignment.
Bungee & brake lines
I copied the factory built taildragger hose layout