KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  11-7-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Forward Fuselage

Today I riveted the remaining positions on the rudder pedal channel along with the floor level of the forward interior skins. Installed the hydraulic hoses that go to the park brake valve from the left set of master cylinders & tightened the lock nuts on the rod ends, installed the remaining split pins on the pedal pivot hardware then made a set of bungees to hold some tension on the rudder cables. These may stretch over time but at the pace I'm building, I'll know how well they hold up before the first flight. On to the firewall installation, some priming of lap joints done, most components clecoed to the firewall, centre console parts clecoed in to confirm it's all still in alignment.
' style=

Bungee & brake lines

Bungee & brake lines

' style=

I copied the factory built taildragger hose layout

I copied the factory built taildragger hose layout

' style=

Co-pilot side

Co-pilot side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.