It's been so long since making a log entry, I almost forget how. I have lots of photos from recent visits to the factory that I'll post as a prequel to todays post. Over the last two days I've produced spacers for the wing spar carry through, this will help with the alignment problem I've faced with the forward fuselage. At the suggestion of Armin at the factory, today I commenced cutting inspection holes in the cockpit floor skin so as to aid replacement/inspection of the fuel lines.
Hardwood spacer 200 x 200 x 23.3mm
Nibbler works well
Rivnuts for a standard inspection plate in the floor