KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  9-7-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Centre Fuselage

This morning I manufactured a new base plate for the cabin heater splitter box from 0.032" thick 6061-T6 then I obtained the elevator control stops from the finishing kit. Deburred them in preparation of alodining. PGC kindly gave me some of his spare hinge for my heater box as I can't find mine.
' style=

New base plate

New base plate

' style=

New hinge to be cut

New hinge to be cut

' style=

Elevator control stops

Elevator control stops

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.