KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  12-8-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Rear Fuselage

PGC & I today installed our static ports. The factory let us know the best position for the ports (just ahead of rib 5 on the Sling 2) & as we had previously purchased the SafeAir 1 pitot/static kits, we could now proceed with this part of the build, something that we have been delaying for some time. 0.25" holes in the skins, deburr, strip the paint from the inside surface & rough with scotch-brite then clean with acetone. Flamemaster B2 sealant was used as the adhesive. PGC was very kind in making me some clamps & spacers for the installation & they worked very well, thank you. All in all quite straight forward. It will be interesting to see how accurate this static port position will prove to be.
' style=

Factory instructions

Factory instructions

' style=

Hole position marked

Hole position marked

' style=

Surface prepared

Surface prepared

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.