KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  9-1-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Rear Fuselage

Today I was able to start installing the wiring by plagiarising PGC's method of passing the Ray Allen elevator trim wire through a protective conduit, this wire will eventually find its way to the VPX electronic circuit breaker box. The VHF antenna wire has also been installed, protected by PVC tubing as per factory standard practice, I'll also be placing small strips of continuous grommet in strategic positions to give as much anti-chafe protection as possible. My heat gun threw the towel in not long ago so I lost a little time today in going to the store to purchase another. The strobe light wiring will be installed tomorrow after passing it through some heat shrink tube.
' style=

VHF antenna wire

VHF antenna wire

' style=

Elevator trim wire

Elevator trim wire

' style=

Lots of excess wire

Lots of excess wire

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.