KitLog pro

Powered By Kitlog Pro v2.0

Des' Web Site
' style=
Date:  11-13-2015
Number of Hours:  14.00
Manual Reference:  
Brief Description:  Right Wing

This morning GAM & I leak checked the fuel tank then washed it down prior to priming the mating surfaces & installing. There was some squeeze out of the sealant used to assemble the tank that required trimming too. Installing the tank is quite a challenge in that it is such a tight fit, we were however able to use our experience from the left wing to pre-empt some issues. The mounting bolts were torqued to 60"lb. PGC called in to the workshop & between the 3 of us we were able to complete the riveting of the bottom of the wing & we turned it over so I will be able to complete the top tomorrow.
' style=

Leak check then washdown

Leak check then washdown

' style=

Bottom side complete

Bottom side complete

' style=

Just a few rivets to go on the top

Just a few rivets to go on the top

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.