KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  5-12-2020
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Installed a firewall pass thru plus

Installed two shunts. One for each alternator and ran wire from where the alternators will be to the alternator fuse locations, then to the respective shunts and then back to the respective batteries.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.