Powered By Kitlog Pro v2.0
Norris's RV Construction
RV10
All
11-16-2020
< Previous Log Entry
Next Log Entry >
Date:
11-16-2020
Number of Hours:
6.00
Manual Reference:
Brief Description:
Second skin fixture
Made a fixture to bend the "second skin" that goes on the front of the fuel tank for the expulsive deice system
Position where half rolled
Starting position where sheet can be slid between the rollers
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home
Copyright © 2001-2024 Matronics. All Rights Reserved.