KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  3-9-2020
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Installed battery contactors plus work on panel

Layed out and drilled the panel locations for the three G3x screens. Installed the alternate static port.
' style=

Dual battery contactors installed

Dual battery contactors installed

' style=

Laying out the panel.  Picture shows back of panel in the layed down position

Laying out the panel. Picture shows back of panel in the layed down position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.