KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  9-18-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Tried sanding down and repainting top of L wing

Sanding down with a borrowed orbital sander with 800 grit paper worked well. Tried repainting the base coat. Some went on beautifully and some bubbled up. Maybe tried painting too soon after cleaning. Not sure. Have to talk to an expert.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.