Powered By Kitlog Pro v2.0
Norris's RV Construction
RV14a
De Ice
1-23-2015
< Previous Log Entry
Next Log Entry >
Date:
1-23-2015
Number of Hours:
8.00
Manual Reference:
Brief Description:
Filled hole for left landing light
Covered the left wing landing light in preperation for installing the power studs for the left wing deice boots. Note the landing light will be moved out to the left wing tip faring.
Left wing landing light cover
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
RV14a Home
Category
# Logs
# Hours
All
609
3147
10 Interior
1
128
Avionics
90
485
De Ice
33
170
Empennage
90
408
Engine
6
30
Finish Kit
62
338
Firewall Forward
65
379
Fuselage
72
378
Inspection
7
24
Miscellaneous
18
89
None
1
3
Paint
52
251
Shop
4
Wings
108
464
Copyright © 2001-2024 Matronics. All Rights Reserved.