Made a new bracket to mount the gascolator on the cabin side of the firewall under the center cover. Drilled the firewall to accept the bracket and made a doubler for the forward side. Applied 3M 5200 to the doubler and mounted the bracket. Hung the gascolator on the bracket and marked and drilled the firewall for the bulkhead fitting. Made a doubler for the bulkhead fitting.