Powered By Kitlog Pro v2.0
Nate's RV-7 Site
RV-7
Wings
7-14-2021
< Previous Log Entry
Next Log Entry >
Date:
7-14-2021
Number of Hours:
1.50
Manual Reference:
Sect 7-9
Brief Description:
Match Drill Flap Braces
In this work session, I match drilled the flap bracers on the left and the right wing to get the final fit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
22
1835
Empennage
1
412
Fuel Tanks
1
360
Fuselage
15
247
Wings
5
816
RV-7 Home
RV-7 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.