KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  2-21-2020
Number of Hours:  2.00
Manual Reference:  Sect 7-6
Brief Description:  Fuel Tank Work #3

Finally in this work session I also worked on the tank skin. I removed the blue film from the inside of the tank skin, and then scored the rivet lines on the outter side of the skin, and removed the film. then I reassembled the fuel tank skin, ribs and reinforcement anlges, and began match drilling the fuel tank for both riveting and the screw holes around the perimeter.

Finally I analyzed the fit of the T-405 Angle and used the belt sander to remove 1/16" of material around the circumfrence of the inner section to allow a closer fit in the leading edge of the inboard fuel tank T-703R rib.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.