KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-11-2019
Number of Hours:  3.00
Manual Reference:  Page -1
Brief Description:  Practice Kit #2

As part of the work learning to build the plane, I have been investing time into completing practice prjects to better prepare. The purpose of practice project kit #2 is to investigate methods for improved construction of the structure, and to investigate and practice the best methods for priming the aluminium.

During this session, I match driled the spar reinforcement plates to the spar. I also match drilled the left and right ribs to the spar. I then match drilled the spar using the upper and lower skins as per the directions. Finally I deburred all of the holes that I drilled in the skins and sub structure.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.