KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  1-8-2019
Number of Hours:  1.00
Manual Reference:  Sect 6-3
Brief Description:  Vertical Stab Work

I also received the VS-705 nose rib in the mail. Immediately I fit it to the structure. After assuring a good fit, I match drilled the rib to the Vertical Stab forward spar, and also with the vertical stab trim.

After drilling and deburring the VS-705 Nose Rib, I completed the work on the vertical stab frame.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.