KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  10-30-2020
Number of Hours:  4.00
Manual Reference:  Sect 7-6
Brief Description:  Fuel Tank Sealing, Day 6

In this work session, I riveted in two more wing ribs, and sealed in the two last ribs. Slowing down the process, by setting two ribs, letting the sealant dry, then riveting the ribs in later, is a more time consuming process, but it is also MUCH easier to do, and maybe even saves time and engery in the long run.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.