KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  2-22-2020
Number of Hours:  1.50
Manual Reference:  Sect 7-6
Brief Description:  Right Fuel Tank Match Drilling

I finished reassembling the right fuel tank and began match drilling the structure together with a #40 drill.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.