KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  1-30-2019
Number of Hours:  1.00
Manual Reference:  Sect 6-10
Brief Description:  Left Elevator Work, cont..

Finally, I completed assembly of the left elevator and match drilled all of the remaining holes in the structure. After that, I disassembled the entire structure and deburred all of the holes. After deburring I elected to delay dimpling the holes until after I primed all of the parts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.