I also received the VS-705 nose rib in the mail. Immediately I fit it to the structure. After assuring a good fit, I match drilled the rib to the Vertical Stab forward spar, and also with the vertical stab trim.
After drilling and deburring the VS-705 Nose Rib, I completed the work on the vertical stab frame.