Date:  1-22-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Move engine to storage unit

While not directly related to the build process, I'm counting these hours – it was sort of a pain. Fortunately, it was ~60F (ineradicable for Jan 22nd.)

It took some effort, but managed to get the motor (while still in the crate) lifted off the trailer. However, the dolly was about 3 inches to short, so instead of lowering the motor/crate onto the dolly, it landed on the legs of the crane itself. Quick trip back home to get cut, stack, and nail together some 2x4s to make the dolly a little taller and problem solved.
' style=

Capped all ports and added jug of W120 (donated by Mark Runge)

Capped all ports and added jug of W120 (donated by Mark Runge)

' style=

Getting the trailer into the storage unit took some 'trial and error'

Getting the trailer into the storage unit took some 'trial and error'

' style=

All-safe and sound - Harbor Freight engine crane and 1000# funiture dolly.

All-safe and sound - Harbor Freight engine crane and 1000# funiture dolly.