KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
' style=
Date:  1-28-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drill bushings and countersink

Reinstalled elevators and aligned and through drilled for 10-32 screws at both the outbaord (counter weight side) and the inboard (push-rod side).

Needing 1-1/2" MS24693-S280 screws to finish up the preliminary install.

Also spent about 1 hour doing the intial trimming and fitment of the canard tips.
' style=

Plywood boards used to alighn elevators

Plywood boards used to alighn elevators

' style=

#30 cleco (thru hole) and #40 (partial)

#30 cleco (thru hole) and #40 (partial)

' style=

Alighnment and gap at the leading edge looks great

Alighnment and gap at the leading edge looks great

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.