Double checked alignment of elevator-side hinges (now bonded and riveted, but don't yet have the 3/16" screws installed) and installed hinge-pins screws. Mixed a slury of cabo & small amount of flox and installed canard-side hinges. Clamped trailing edges to flat-boards and confirmed everthing was in-plane. Checked levelness of canard hinges and 18.25" leadign edge to trailing edge across span.