Powered By Kitlog Pro v2.0
Timothys Mazda 20B RV-10
RV-10
All
6-25-2011
< Previous Log Entry
Next Log Entry >
Date:
6-25-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
FIRST ENGINE Start
Installed oil filter stantion bypass, Started the engine for the first time, Temp 190, oil temp sensor needs to rerouted, finishing wingtips installed nutplates, wired RPMs
Panel
Firewall
Side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
461
1567
Avionics
7
32
Electrical
21
109
Empennage
17
74
Empennage-Elevators
26
41
Empennage-Horizontal
18
45
Empennage-Rudder
10
19
Empennage-Tail Cone
34
72
Empennage-Vertical S
8
27
Engine
21
159
Engine
32
132
Firewall Forward
8
30
Fuselage
128
475
Inventory
5
10
Lighting
1
1
Paint
1
2
Paint Prep
2
3
Position Lights
1
0
Prop
3
16
Wings
118
320
Copyright © 2001-2024 Matronics. All Rights Reserved.